The static pipe bursting unit position in the exit pit.

Lake Tahoe Steel Water Main Replacement via Pipe Bursting

Incline Village General Improvement District (IVGID) out of Lake Tahoe, NV designed a 2,500 linear feet steel water main distribution system replacement project.  The project included pipe bursting (splitting) existing 6- and 8-inch steel water mains and replacing with new 8-inch Fusible C 900 PVC pipe. The pipe bursting system utilized specialty cutters and expanders […]